The repurposing of this depleted gas formation as a storage reservoir began in 2005.
Haidach 5 has a maximum working gas volume of around 16m cu m (equivalent to 185 GWh), and injection and withdrawal capacity of approx. 20,000 cu m/ hour (231 megawatts, MW).