UGS Puchkirchen/Haag |
| |
Working gas volume |
| 12,500 GWh |
Max. withdrawal capacity |
| 6,000 MW |
Max. injection capacity |
| 6,000 MW |
UGS Aigelsbrunn |
| |
Working gas volume |
| 1,500 GWh |
Max. withdrawal capacity |
| 577 MW |
Max. injection capacity |
| 577 MW |
UGS Haidach 5 |
| |
Working gas volume |
| 185 GWh |
Max. withdrawal capacity |
| 231 MW |
Max. injection capacity |
| 231 MW |
UGS Haidach (marketed by RAG Energy Storage) | ||
Working gas volume |
| 14,400 GWh |
Max. withdrawal capacity |
| 5,900 MW |
Max. injection capacity |
| 5,200 MW |
UGS 7Fields (marketed by RAG Energy Storage) |
| |
Working gas volume |
| 6,300 GWh |
Max. withdrawal capacity |
| 2,600 MW |
Max. injection capacity |
| 1,700 MW |
Sum of storage facilities marketed by RAG Energy Storage |
| |
Working gas volume |
| 34,885 GWh |
Max. withdrawal capacity |
| 15,308 MW |
Max. injection capacity |
| 13,708 MW |
Reserved and free capacity at our storage facilities are as follows:
Withdrawal Capacity (WCI) | Working Gas Volume (WGV) | |||||
---|---|---|---|---|---|---|
Year | WCI Reserved* | WCI Non-TPA | WCI Free* | WGV Reserved * | WGV Non-TPA | WGV Free* |
2023 | 15,308 MW | 100 MW | 0 MW | 34,885 GWh | 577 GWh | 0 GWh |
2024 | 14,492 MW | 100 MW | 600 MW | 31,069 GWh | 577 GWh | 3,112 GWh |
2025 | 6,684 MW | 100 MW | 5,939 MW | 13,927 GWh | 577 GWh | 11,377 GWh |
2026 | 5,484 MW | 100 MW | 7,139 MW | 10,927 GWh | 577 GWh | 11,377 GWh |
2027 | 3,833 MW | 100 MW | 5,359 MW | 7,318 GWh | 577 GWh | 12,186 GWh |
2028 | 3,833 MW | 100 MW | 5,359 MW | 7,318 GWh | 577 GWh | 12,186 GWh |
2029 | 3,833 MW | 100 MW | 5,359 MW | 7,318 GWh | 577 GWh | 12,186 GWh |
2030 | 3,663 MW | 100 MW | 5,529 MW | 7,033 GWh | 577 GWh | 12,471 GWh |
* exkl. Non-TPA
Basically, injection and withdrawal capacity are booked consistently, therefore only withdrawal capacity is illustrated in the table above.
GWh, MW ... thermal with a gross calorific value of 11.54 kWh/m³ according to the current version of the Gas System Charges Ordinance.
A description of the procedure for sending enquiries about capacities to RAG Energy Storage, and the related enquiry form as well as the documentation are available in the Download area.
Storage customers are entitled to offer their capacities on a secondary market (e.g. plattforms like PRISMA: https://platform.prisma-capacity.eu)
Erdgasspeicher Puchkirchen/Haag |
| |
Arbeitsgasvolumen |
| 12.200 GWh |
Max. Ausspeicherkapazität |
| 5.900 MW |
Max. Einspeicherkapazität |
| 5.900 MW |
Erdgasspeicher Aigelsbrunn |
| |
Arbeitsgasvolumen | 1.500 GWh | |
Max. Ausspeicherkapazität |
| 566 MW |
Max. Einspeicherkapazität |
| 566 MW |
Erdgasspeicher Haidach 5 |
| |
Arbeitsgasvolumen |
| 181 GWh |
Max. Ausspeicherkapazität |
| 226 MW |
Max. Einspeicherkapazität |
| 226 MW |
Erdgasspeicher Haidach (vermarktet von RAG Energy Storage) |
| |
Arbeitsgasvolumen |
| 14.100 GWh |
Max. Ausspeicherkapazität | 5.800 MW | |
Max. Einspeicherkapazität |
| 5.100 MW |
Erdgasspeicher 7Fields (vermarktet von RAG Energy Storage) | ||
Arbeitsgasvolumen |
| 6.200 GWh |
Max. Ausspeicherkapazität | 2.600 MW | |
Max. Einspeicherkapazität |
| 1.700 MW |
Summe der von RAG Energy Storage vermarkteten Speicher |
| |
Arbeitsgasvolumen |
| 34.181 GWh |
Max. Ausspeicherkapazität |
| 15.092 MW |
Max. Einspeicherkapazität | 13.492 MW |
Die gebuchten und freien Kapazitäten der Speicherlagerstätten für die kommenden Jahre sehen wie folgt aus:
Ausspeicherleistung (ASL) | Arbeitsgasvolumen (AGV) | |||||
---|---|---|---|---|---|---|
Jahr | ASL Gebucht* | ASL Non-TPA | ASL Frei* | AGV Gebucht* | AGV Non-TPA | AGV Frei* |
2022 | 15.092 MW | 100 MW | 0 MW | 34.181 GWh | 566 GWh | 0 GWh |
2023 | 15.092 MW | 100 MW | 0 MW | 34.181 GWh | 566 GWh | 0 GWh |
2024 | 15.092 MW | 100 MW | 0 MW | 34.181 GWh | 566 GWh | 0 GWh |
2025 | 4.364 MW | 100 MW | 4.828 MW | 8.127 GWh | 566 GWh | 11.389 GWh |
2026 | 4.364 MW | 100 MW | 4.828 MW | 8.127 GWh | 566 GWh | 11.389 GWh |
2027 | 3.833 MW | 100 MW | 5.359 MW | 7.318 GWh | 566 GWh | 12.198 GWh |
2028 | 3.833 MW | 100 MW | 5.359 MW | 7.318 GWh | 566 GWh | 12.198 GWh |
2029 | 3.833 MW | 100 MW | 5.359 MW | 7.318 GWh | 566 GWh | 12.198 GWh |
2030 | 3.663 MW | 100 MW | 5.529 MW | 7.033 GWh | 566 GWh | 12.483 GWh |
* exkl. Non-TPA
Grundsätzlich werden Ein- und Ausspeicherleistung ident gebucht, daher wird in der Tabelle mit den gebuchten und freien Kapazitäten ausschließlich die Ausspeicherleistung dargestellt.
GWh, MW ... thermisch mit Verrechnungsbrennwert von 11,32 kWh/Nm³ lt. aktueller Fassung der GSNE-VO.
Die Beschreibung zum Ablauf der Kapazitätsanfrage und das Formular für eine Kapazitätsanfrage für Speicher RAG sowie weitere Dokumente stehen Ihnen im Download-Bereich zur Verfügung.
Speicherkunden sind berechtigt ihre Kapazitäten am Sekundärmarkt anzubieten (z.B. via PRISMA: https://platform.prisma-capacity.eu).
Contact
Executive Board:
Thomas Lejcko
T +43 50 724-5502
F +43 50 724-5599
M +43 664 811 9494
Send E-mail
Georg Dorfleutner
T +43 50 724-5501
F +43 50 724-5599
M +43 664 811 9486
Send E-mail